Quick answer
Before Demolition, back up the original, confirm format/size/quality requirements and close programs that lock the file. Test/abate before demolition; otherwise illegal/hazardous.
Why it matters
Poor preparation leads to overwrites, failures and rework.
Test.
Step by step
- Test/confirm asbestos material and scope.
- Separate containment/removal/disposal/permits/repair.
- Use licensed/insured contractors only.
- Contract states scope/air testing/disposal/warranty.
Common mistakes
- Demolishing without testing.
- Hiring unlicensed low-cost crews.
- Ignoring containment/air testing.
- Non-compliant disposal/permits.
Checklist
- Material/testing/scope.
- Containment/negative air/air testing.
- Removal/disposal/permits.
- Repair/warranty/insurance.
- Health/protection/budget.
Key facts
- Test.
- Abate.
- Rules.
FAQ
How should I prepare before Demolition?
Before Demolition, back up the original, confirm format/size/quality requirements and close programs that lock the file. Test/abate before demolition; otherwise illegal/hazardous.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: EPA